Ausgrid Lindfield

The East Lindfield Sub-transmission Switch project involved the rock excavation and concrete construction of a 4 level insitu building and roof on a steep site at Lindfield. Unique features include 320mm thick concrete walls with a batten inprint to replacate the branches of trees, 12m high louvre panels, 400mm thick concrete roof and a 30m long steel bridge from the road to the control room.


VALUE
$4,200,000
DURATION
48 weeks
CLIENT
Ausgrid
ARCHITECT
Caldis Cook Group